Nearly twenty stories up these construction workers don't have time to appreciate the Cleveland skyline. They are pouring the cap on Pier 5 of the new Innerbelt Bridge.
Using a hydraulic system they are pumping concrete up into the form that will create the top of the bridge pier. They must carefully work the concrete into a maze of reinforcing rebar, kneeding and tamping the concrete like a baker, to insure that no air pockets form. This would weaken cure.
An extensive array of pipes snakes its way throughout the rebar. As the concrete is pumped into the form, these pipes will become submerged in that "mud." Cool water will begin flowing to keep the concrete from getting too hot during the curing process. After approximately ten days the forms are disassembled and carefully lowered to the ground.
In this picture the Norfolk & Southern railway trestle crosses the river into Tremont on the west bank. It passes the area previously occupied by Cleveland Cold Storage.
Sunday, July 17, 2011
Cold Storage Meets Alien
© Stuart Pearl 2011 - Click on Images to EnlargeStrange and powerful machines have been the fodder of many childhood nightmares. They tower over us with their open, menacing jaws and giant steel teeth.

I had some of those bad dreams in my own childhood. But more recently I am reminded of the movie "Alien." In one scene that creature bursts from the chest of an unsuspecting crewmember.
At the site of Cleveland Cold Storage last week, a similar evil looking device was ripping the flesh and bones from that old landmark. At times it was as if the biting head would pause to examine it's handiwork before plunging in for another bite.

This old landmark on the West bank of the Cuyahoga is directly in the path of the new Westbound Innerbelt bridge. Within the next few weeks it will be completely reduced to rubble. Perhaps these old bones will gain new life as part of Cleveland's breakwall. Or maybe the concrete will provide the foundation of a new lakeshore dike for wildlife.
Thursday, June 23, 2011
Cleveland Innerbelt Bridge Project - June 2011
© Stuart Pearl 2011 - Click on Image to Enlarge
Bridges have always fascinated me. As a young boy my brother and I would build them in our backyard, digging roads with our Tonka trucks, and creating rivers and lakes with the garden hose.
My brother Arnold and cousin Alan building cities in the "Dirt Place" in 1960.

The first of 14 massive bridge piers are now being built across the Flats valley which will support the new twin Inner Belt bridges. Steel piles are being driven about 200 feet down to bedrock to provide anchor points for each of the piers. Each steel pile is 55 feet in length and weighs about 12,000 pounds.

Concrete and rebar base of brige pier.
Worker in "pier pit."Construction is now focused on the Westbound bridge which should be completed in 2013-14. It is being built just north of the existing bridge.

The old Cleveland Cold Storage building sits on the west bank of the Cuyahoga and is an early casualty of the construction. It sits directly in the path of the Tremont landing spot for the bridge. Built in 1927-1928 it was a huge insulated storage facility that was used for food distribution throughout the city. It played a major role in Cleveland's food services industry.
The present bridge carries about 119,000 cars each day. Sometimes a lone cyclist will brave the narrow metal sidewalk . When this man rode by, there was barely room for me to squeeze up against the railing while staring at the Cuyahoga river 273 feet below. I really don't like heights.
Storm coming up from the South of the Innerbelt and Hope Memorial bridges.Tuesday, April 13, 2010
Butler Museum Accepts Flats Work
© Stuart Pearl 2010 (Click Image to Enlarge)Each year Youngstown's Butler Institute of American Art holds its Midyear Show. This juried competition is open to artists nationwide. I was again fortunate to have one of my photographs accepted for display in the 2010 show. The opening is Sunday June 27.

I have walked this bridge a couple of times now looking for different vantage points and variations in lighting. To my shock I discovered there are others even more daring than myself. The picture above was taken during warmer times but it shows that bike riders use the interstate bridge to cross the Cuyahoga also.There was no place to go when this lone rider came pedalling up the sidewalk. I just thought "thin" and became one with the railing. He rolled right by as if he does this everyday. That could be very likely true. Plans are underway for construction of the new Inner Belt bridge. Many have suggested a more user-friendly walkway. I can certainly understand why.
Allied Corporation property on the West Bank
"The Three Roofers" Annunciation Greek Orthodox ChurchThis early morning Tremont picture was shot during the summer as roofers repaired a church roof. It shows there is always something going on.
The city constantly changes for my lens. It's just a matter of being alert to new opportunities. The same Cleveland landmark will reveal a different face from season to season as well as from dawn to dusk. Some of these pictures end up as simple snapshots recording the ongoing history. Other images may achieve the status of "artwork," rendering an interpretation that is unique in it's composition. Hopefully all will be enjoyed.